Call for Suppliers: SCC Fund SP Supply Chain Partnership
From: Dr. Yutaka Niihara, Fund Manager
Date: April 14, 2025
Confidential – For Intended Recipients Only
SCC Fund SP, a segregated portfolio under ChainBLX SPC (CIMA-regulated, Cayman Islands), is building a blockchain-powered trade system to deliver affordable medication and ethically sourced minerals across Africa. Backed by a $61M investment, we aim to serve 50 million patients by 2029, replacing traditional aid with a transparent, high-efficiency model using our SCC-BCF (Blockchain Certification Framework).
We seek long-term supplier partners in the following categories:
1. Pharmaceutical Manufacturing & Bulk Medicine Supply
Target Drugs & Annual Reference Costs (for 50M patients):
- L-Glutamine: $372.30 per patient
- Abacavir (300mg): $41.36
- Lamivudine (300mg): $19.82
- Tenofovir (300mg): $43.61
- Malarone (Atovaquone/Proguanil): $57.08
- Metformin: $16.92
- Benazepril: $24.00
- Amlodipine: $10.84
- TB Combination (INH, Rifampin, Pyrazinamide): $73.65
- Penicillin G (injectable): $58.40
Expectations:
- Offer pricing at minimum 30% below these listed benchmarks.
- Demonstrate capacity to serve 10M patients in year one, scaling to 50M.
- Provide certifications (e.g., WHO PQ, equivalent GMP).
2. Transportation & Freight
- Volume: 1,000 metric tons annually.
- Mode Split: 90% sea, 10% air.
- Pricing Cap:
- Sea freight: max $0.31/kg
- Air freight: max $6/kg (for priority batches only)
Requirements:
- Full-chain temperature control (15–25°C ambient, 2–8°C cold chain)
- IoT tracking for location and temperature
- Blockchain-logged delivery events (Hedera integration)
3. Cold Chain Storage & Warehousing
- Initial Buildout:
- 10,000 sq ft refrigerated per site
- 40,000 sq ft ambient
- Specs:
- <55% humidity, 99.9% uptime
- IoT-linked monitoring systems
- Real-time alerts and blockchain audit trail (Filecoin/Hedera)
4. Construction & Bonded Warehouses
- Phase 1 (2026): Build 3 bonded sites (50,000 sq ft each)
- By 2029: Expand to 10 sites (total 700,000 sq ft)
- Specs:
- HVAC, insulated, expandable layout
- 25% reserved for modular growth
- Duty-free compliance
5. Support Services
- Supply mining and packaging equipment (100K tons/year output)
- Implement blockchain-tracked maintenance
- Handle disposal of expired/rejected batches
- Meet all labor and eco-compliance standards
Supplier Requirements
Experience:
- 3+ years in industry
- Demonstrated delivery of comparable volumes or infrastructure
Pricing & Efficiency:
- Minimum 30% discount from listed benchmarks
- Commitment to 25% operational savings via blockchain workflows
Compliance & Ethics:
- Verified clean labor history, $2/hr wage minimum
- CO₂ emissions under 50 tons/site/year
- No child labor, full traceability
- 5% of mining revenues redistributed locally via Tron wallets
Technical Integration:
- Blockchain:
- Hedera for compliance logs
- Filecoin for decentralized storage
- Tron for payments & micro-incentives
- IT Capabilities:
- IoT/API ready
- 10,000 TPS+ throughput
- 256-bit AES encryption
- Sandbox API ready by Dec 2025
Local Engagement:
- 20% of contracts awarded to African suppliers
- Hire and train 550 local employees by 2029
- Use 30% local construction materials per site
Responsibilities
- Timelines:
- 15-day production cycles
- 48-hour shipping lead
- 6-month warehouse completion
- Reporting: Daily performance and compliance via SCC-BCF dashboard
- Audits: Quarterly compliance reviews (99% threshold)
- Blockchain Compliance:
- Upload activity logs (Hedera)
- Store batch docs and audits (Filecoin)
- Transact in SCC Tokens via smart contracts
Application Process
EOI Deadline: October 15, 2025
Submit to: suppliersSCC@chainblx.com
Format: 5-page PDF max, including:
- Company history (last 3 years)
- Product/service category and capacity
- Proof of pricing competitiveness
- API/IoT integration readiness
- Signed commitment to SCC-BCF compliance
Selection Schedule:
- Shortlisting: November 25, 2025
- Pilot/Sandbox Testing: December 2025
- Final Contracts Awarded: January 15, 2026
- Onboarding: February–March 2026
- Go-Live: Q2 2026